News

SGC - SwitchGear Company all over the world

New realization for Sibelga!

They visited us to conduct the Factory Acceptance Test (FAT) for our DF-2 cubicles before it will be installed on site by our partner Deba. They will manage and install everything within two weeks to ensure the delivery of the project.

The station, called P.R. Ropsy Ecole, will be equipped with Air Insulated Switchgear cubicles of our Premium Line DF-2 (built to last, 17,5 kV, 800A). This system allows us to provide “made-to-measure” solutions for all your medium voltage needs.

Sibelga provided us with the technical plan itself and we took care of its elaboration. The technical drawing can be found below.

Proud of the collaboration with Sibelga.